все хорошо!
Подробнее о работе
Гарантия сервиса Автор24
Уникальность не ниже 50%
ВАРИАНТ 3
Задание 1
1. For many years railway tracks have been laid and repaired by hard manual labor. Present Perfect Passive. Nowadays, this work is being done ny means of up-to-date track machines and mechanisms. Present Continuous Passive.
2. Train drivers were instructed to drive at a slow speed during the foggy condition. Past Simple Passive.
3. The rails are connected to each other by railroad ties, which are made of wood, concrete or other material. Present Simple Passive.
4. After the Liverpool-Manchester Railway had been built, the railway company offered a reward of 500 pounds for the best steam locomotive. Past Perfect Passive. Past Simple Active.
Не подошла эта работа?
Закажи новую работу, сделанную по твоим требованиям
ВАРИАНТ 3
Задание 1
1. For many years railway tracks have been laid and repaired by hard manual labor. Present Perfect Passive. Nowadays, this work is being done ny means of up-to-date track machines and mechanisms. Present Continuous Passive.
2. Train drivers were instructed to drive at a slow speed during the foggy condition. Past Simple Passive.
3. The rails are connected to each other by railroad ties, which are made of wood, concrete or other material. Present Simple Passive.
4. After the Liverpool-Manchester Railway had been built, the railway company offered a reward of 500 pounds for the best steam locomotive. Past Perfect Passive. Past Simple Active.
Купить эту работу vs Заказать новую | ||
---|---|---|
0 раз | Куплено | Выполняется индивидуально |
Не менее 40%
Исполнитель, загружая работу в «Банк готовых работ» подтверждает, что
уровень оригинальности
работы составляет не менее 40%
|
Уникальность | Выполняется индивидуально |
Сразу в личном кабинете | Доступность | Срок 1—5 дней |
400 ₽ | Цена | от 200 ₽ |
Не подошла эта работа?
В нашей базе 51749 Контрольных работ — поможем найти подходящую